Page not found

Search results

  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  2. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ... Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  4. 2023 Water Irrigation Rates

    Public Utilities | Page

    04-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer Charges Charges ... calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" ... 6" Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 $207.48 Commodity Charges Charges ...

  5. City Council Worksession

    City Council | Calendar Event | 11/14/22 04:30pm

    kgibeau@grandrapidsmn.gov b3e9fd5c-53c0-4e36-9526-c3d0a036f773 Sort A to Z Agenda (HTML) Agenda Packet (HTML) ... Slideshow Display Contact Info Block Calendar Event City Council Worksession Agenda Packet GRAPIDSMN ...

  6. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Notary Stamp: Date:____________________________ LIC 04 (5/15) Certificate of Compliance Minnesota ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ...

  8. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ... 8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Provided ....................................................................................................... 9  5.3.  Pre ... completed Interconnection Applications in a year. The public queue will be updated, at  minimum, on a monthly basis.    4.3. Interconnection Application Process Fees  ...

  10. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

Pages