Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    contract revenues 24,100 26,124 38,351 (2,024) (12,227) Payment in lieu of taxes (870,377) (882,288) ... Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  2. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  5. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ...

  6. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  7. Garages: One Story

    Community Development | Page

    4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... 12’10” SPF 5’8” 8’5” 10’8” 13’1” 24” o.c. Hem Fir 4’8” 6’9” 8’7” 10’6” SPF 4’8” 6’11” 8’9” 10’8” ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ...

  8. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2023 Wastewater Collection & Treatment Rate Schedule- City- Adopted 12/14/2022 2023 Wastewater ...

  9. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... 23: 24: 25: 26: 27: 28: 29: 30: 31: 32: 33: 34: 35: 36: 37: 38: 39: 40: 41: 42: 43: 44: 45: 46: 47: ...

  10. Financial Reports

    Finance | Page

    Governmental Funds to the Statement of Activities Statement 5 42 Statement of Net Position- Proprietary Funds ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Changes in Fund Balance- Nonmajor Debt Service Funds Statement 24 132 Subcombining Balance Sheet- Nonmajor ...

Pages