Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ...

  2. 2023 City Water Rates

    Public Utilities | Page

    $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ...

  3. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    minutes from the March 22, 2018 regular meeting. 5. Consider approval of claims 6. Consider approval of ... AUTHORITY REGULAR MEETING THURSDAY, MARCH 22, 2018 4: 00 P.M. GRAND RAPIDS CITY HALL — CONFERENCE ROOM 2A ... on Thursday, March 22, 2018 at 4: 00 p.m. in Conference Room 2A of City Hall, 420 North Pokegama ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ...

  6. Basic Wood Framing

    Community Development | Page

    9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  7. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  8. Garages: One Story

    Community Development | Page

    Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ... 2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ...

  9. Financial Reports

    Finance | Page

    Governmental Funds to the Statement of Activities Statement 5 42 Statement of Net Position- Proprietary Funds ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ...

  10. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22 ...

Pages