Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Nonoperating Revenues and Expenses 65 Annual Capital Contributions by Source 66 Revenue Capacity Electric ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  6. Financial Reports

    Finance | Page

    General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ... Activities Debt Table 12 180 Demographic and Economic Information: Legal Debt Margin Information Table 13 181 ...

  7. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  8. Community Development Fee Schedule

    Community Development | Page

    $50,000.00 $391.65* for the first $25,000.00 plus $10.20* for each additional $1,000.00 or fraction thereof, ... thereof, to and including $2,000.00 $2,001.00- $25,000.00 $70.00 * for the first $2,000.00 plus $14.20* for ... to and including $50,000.00 $50,001.00 to $100,000.00 $650.20* for the first $50,000.00 plus $7.10* ...

  9. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22: ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    schedule 12 5:20 COMMUNITY DEVELOPMENT p.m. 15. 12-0397 Consider adoption of a resolution issuing an order ... Attachments: Foust Vacation Resolution- 6-25-12 Recess regular meeting for 2nd scheduled public hearing. 20 ... citycouncil_agenda_2012-06-25.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ...

Pages