Page not found
Search results
-
2023 Wastewater Collection & Treatment Rate Schedule
Public Utilities | Page/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Page12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ...
-
2023 City Water Rates
Public Utilities | Page$207.48 Charges calculated are per 1000 gallons per month City Residential First 4,000 Gallons Next 4,000 ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ...
-
2022 Cost of Service Studies
Public Utilities | Page19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...
-
Public Utilities Financial Reports
Public Utilities | PageCollection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ...
-
MPCA MS4 Permit Public Notice Copy
Engineering / Public Works | Pagea new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...
-
Economic Development Authority Regular Meeting
Economic Development Authority | Calendar Event | 04/26/18 04:00pmreferred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...
-
Financial Reports
Finance | PageGeneral Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ... Activities Debt Table 12 180 Demographic and Economic Information: Legal Debt Margin Information Table 13 181 ...
-
Basic Wood Framing
Community Development | Page9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 1 2-0 1 1-9 1 2-2×6 3-5 2 3-0 2 2-8 2 2-2×8 4-4 2 3-9 2 3-5 2 2-2×10 5-3 2 4-7 3 4-2 3 2-2×12 6-1 2 5-4 ...
-
2023 Adopted Levy and Tax Rate
Finance | PagePage Categories 2023 Adopted Levy and Tax Rate Sort A to Z 2023_levy_and_tax_rate.pdf 2018 Levy 2019 ... 25,000 25,000 15,000 20,000 Special Levies----- Total Levy Required for Operations 6,019,239 6,098,764 ... CERTIFIED LEVY 7,689,023 7,793,670 8,079,328 8,603,265 8,603,265 3.79% 1.36% 3.67% 6.48% 0.00% TAX CAPACITY ...