Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... All Gallons $4.99 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15 ... /2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    12,931,589$ 13,831,851$ 14,777,844$ 15,568,697$ 16,178,333$ Distribution Operations Supervision and ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...

  5. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ... GRAND RAPIDS PUBLIC UTILITIES COMMISSION CITY WATER SERVICE RATE SCHEDULE Adopted: 12 ...

  6. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20,000 ...

  7. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Beacon Relocation 13 Airfield Lighting Replacement 14 FBO Improvements 15 Airport Zoning Update 16 Buildings Five ... Carpet Replacement‐Third Floor 28 Library Upgrades 29‐34 Carpet Replacement‐Council Chambers 35 Central School Upgrades 36‐54 ...

  8. Basic Wood Framing

    Community Development | Page

    1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  9. Financial Reports

    Finance | Page

    time surviving through the winter months. the current opinion of cost for the project is $15.5 million. ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ...

  10. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22: ...

Pages