Page not found

Search results

  1. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    2023 Wastewater Collection & Treatment Rate Schedule- City- Adopted 12/14/2022 2023 Wastewater ... Collection & Treatment Rate Schedule- Rural- Adopted 12/14/2022 Image Slideshow Display Contact Info ... COMMISSION CITY WASTEWATER COLLECTION & TREATMENT SERVICE RATE SCHEDULE Adopted: 12-14 ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ... expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ...

  5. 2023 City Water Rates

    Public Utilities | Page

    2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ... GRAND RAPIDS PUBLIC UTILITIES COMMISSION CITY WATER SERVICE RATE SCHEDULE Adopted: 12-14 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12/14 ... /2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ... 12,931,589$ 13,831,851$ 14,777,844$ 15,568,697$ 16,178,333$ Distribution Operations Supervision and ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...

  8. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  9. Complete 3.2 Beer Application

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... 2500 Print: Group3: 200: 200 150: 150 100: 100 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: ...

  10. Decks

    Community Development | Page

    x10 3-2x12 3-2x12 14’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x12 3-2x12 3-2x12 15’ 2-2X6 ... X10 14’5” 12’10” 11’6” 10’6” 9’9” 9’1” 8’7” 3-2X12 17’5” 15’1” 13’6” 12’4” 11’5” 10’8” 10’1” 2 Cedar, ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

Pages