Page not found

Search results

  1. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... $207.48 Charges calculated are per 1000 gallons per month City Residential First 4,000 Gallons Next 4,000 ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ...

  3. 2023 Electric Security Light Rates

    Public Utilities | Page

    Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12/14/2022 ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  5. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 02/08/18 04:00pm

    Meeting 2Thursday, January 11, 2018 DATE: 02/ 02/ 2018 TIME: 13: 11: 57 ID: AP443000. CGR EDA BILL LIST- ... agenda item. 4. Approval of minutes from the Jan 11, 2018 regular meeting. 5. Consider approval of claims ... ECONOMIC DEVELOPMENT AUTHORITY REGULAR MEETING THURSDAY, JANUARY 11, 2018 4: 00 P.M. GRAND RAPIDS CITY HALL ...

  6. Public Utilities Financial Reports

    Public Utilities | Page

    December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    Recorder GREDA Regular Meeting Thursday, March 22, 2018 a DATE: 04/ 18/ 2018 TIME: 11: 17: 19 ID: AP443000. ... f r / sf, or $851.40/ month. The negotiated rate for this trial period lease is $ 500.00/ month, is is in ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ...

  8. Data Request

    Police | Page

    BUILDING Monthly Rental Fees Garden Level $11.02 * 1st Floor $11.97 * 2nd Floor $11.49 * 3rd Floor $ 8.58 ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    1301015MACQUEENEQUIPMENTINC674.79 1301720MATCOTOOLS40.56 1309725MITCHELL11,608.00 1415030NAPASUPPLYOFGRANDRAPIDS17.63 ... .00 1315630ASHLEYMORAN40.00 1315654NATHANMORLAN11.30 1405435JEREMYNELSON80.00 1405850NEXTERACOMMUNICATIONSLLC475.80 ... REVENUE 2, 907. 06 1315295 CHAD MOEN 40. 00 1315630 ASHLEY MORAN 40. 00 1315654 NATHAN MORLAN 11. 3C ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    CP 2015‐1, City Wide Overlays‐Sylvan 111 CP 2018‐3, 10th St NE (3rd Ave to CDS) 112 CP 2018‐4, 11th St NE (2nd Ave to 3rd Ave) 113 ... 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ...

Pages