Page not found

Search results

  1. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    Sawmill Inn site. 10. Updates: a. 11. Adjourn GREDA Members/ terms: Dale Christy— 12/ 31/ 18 (with council ... referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  6. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Notes to Financial Statements 49 Required Supplementary Information: Budgetary Comparison Schedule- ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  7. Basic Wood Framing

    Community Development | Page

    (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... 2 3-3 2 2-11 2 2-2×8 4-9 2 4-2 2 3-9 2 2-2×10 5-9 2 5-1 2 4-7 3 2-2×12 6-8 2 5-10 3 5-3 3 3-2×8 5-11 ... 1 2-2×6 3-6 2 3-1 2 2-9 2 2-2×8 4-6 2 3-11 2 3-6 2 2-2×10 5-6 2 4-9 2 4-3 2 2-2×12 6-4 2 5-6 3 5-0 3 3-2×8 ...

  8. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2023 Wastewater Collection & Treatment Rate Schedule- City- Adopted 12/14/2022 2023 Wastewater ...

  9. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    TOTALGENERALADMINISTRATION22,948.49 12/10/13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 ... COMPANY 204. 84 TOTAL FIRE 12, 097. 49 INFORMATION TECHNOLOGY 0300200 CDW GOVERNMENT INC 619. 10 1915248 ... TOTAL GFNERAL ADMINISTRATION 22, 948. 49 12/ 10/ 13- 1/ 6/ 14 INVESTMENTS- 0- GRAND RAPIDS CITY COUNCIL ...

Pages