Page not found

Search results

  1. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    Sawmill Inn site. 10. Updates: a. 11. Adjourn GREDA Members/ terms: Dale Christy— 12/ 31/ 18 (with council ... referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  4. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... $5.71 $3.99 $238.10 0 164 165 328 329 1,230 over 1,230 42 $5.71 $3.99 $243.81 0 168 169 336 337 1,260 ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...

  5. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  6. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  7. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2015‐1, City Wide Overlays‐Sylvan 111 CP 2018‐3, 10th St NE (3rd Ave to CDS) 112 CP 2018‐4, 11th St NE (2nd Ave to 3rd Ave) 113 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ...

  8. Financial Reports

    Finance | Page

    Governmental Funds to the Statement of Activities Statement 5 42 Statement of Net Position- Proprietary Funds ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Information for interconnecting all  Distributed Energy Resources smaller than  10 ...  Energy Resource ............................................................................................ 2  1.2.  Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2  ...  .......................................................................................................................... 6  4.2.  Availability ...

  10. Garages: One Story

    Community Development | Page

    4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...

Pages