Page not found
Search results
-
MPCA MS4 Permit Public Notice Copy
Engineering / Public Works | Pagea new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...
-
Complete 3.2 Beer Application
Administration | Pageof twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Complete 3.2 Beer Application Image Slideshow Display Contact Info Block Web Page Menu Settings ...
-
2023 Load Management Electric Service Rate Schedule
Public Utilities | PageMonthly Credit 12/14/2022 01/01/2023 01/01/2023 All kWh/mo @ $0.0699/kWh Minimum bill- Customer Charge All ... Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ... 2023 Electric Load Management Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...
-
2022 Cost of Service Studies
Public Utilities | Page29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...
-
Public Utilities Financial Reports
Public Utilities | Pageexpense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...
-
2023 City Electric Interim Annexation Areas Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12 ... 2023 City Electric Interim Annexation Areas Service Rate Schedule- Adopted 12/14/2022 Image ... RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ...
-
Complete Application Packet: Off-sale
Administration | Pageof twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Notary Stamp: Date:____________________________ LIC 04 (5/15) Certificate of Compliance Minnesota ...
-
2023 Rural Electric Service Rate Schedule
Public Utilities | Page/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 2023 Electric Rural Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ...
-
2023 City Electric Service Rate Schedule
Public Utilities | PageLIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04 ... 2023 City Electric Service Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info ...
-
2023 Electric Vehicle Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12 ... 2023 Electric Vehicle Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ... After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ...