Page not found
Search results
-
Data Request
Police | PageWithin 30 days, 7 Approved by the City Council on xx/xx/03 the Responsible Authority or designee must ... For licensees with service of less than thirty (30) days in a seasonal period less than six (6) months ... over 30” high (non-enclosed) Attached Steps/Deck (non-enclosed) Covered porch (non-enclosed) $40.30 ...
-
Public Utilities Financial Reports
Public Utilities | Pagein northcentral Minnesota, and is the county seat of Itasca County. On March 30, 1910, the Grand ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ...
-
2022 Cost of Service Studies
Public Utilities | Pagethe monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...
-
Grand Rapids Monitoring Results
Public Utilities | Page4:30 p.m., Monday through Friday. Some contaminants are monitored regularly throughout the year, and ... times where the Range of Detected Test Results for the calendar year is lower than the Highest Average ... or Highest Single Test Result because it occurred in the previous calendar year. Definitions AL ...
-
Community Development Fee Schedule
Community Development | Page” high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40.30 ... $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 ...
-
Utility Information
Engineering / Public Works | PagePractices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ...
-
Solar Energy Rebate Program
Public Utilities | PageRAPIDS PUBLIC UTILITIES COMMISSION SOLAR ELECTRIC REBATE PROGRAM.5 kW – 40 kW The Grand Rapids Public ... twelve months energy consumption. Installation Requirements: 1. Receive GRPUC approval prior to ... earlier of three months of receiving approval of the interconnection agreement or before the end of the ...
-
Stormwater Credits Policy
Engineering / Public Works | PageOrdinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...
-
2021-2025 Amended Capital Improvement Plan
Finance | PageCP 2017‐2, City Wide Overlays‐7th Ave SE 102 CP 2022‐1, Hwy 2 Lighting Replacement 103 Year Project Starts: 2023 ... projects will be submitted to the City Council individually and will begin impacting the 2022 calendar year ... capital improvement plan and the issuance of bonds thereunder. 1.03 The City has caused to be prepared the ...
-
2023 City Water Rates
Public Utilities | PageGallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... $207.48 Charges calculated are per 1000 gallons per month City Residential First 4,000 Gallons Next 4,000 ...