Page not found
Search results
-
Decks
Community Development | Pageto 8’ 8’1” to10’ 10’1” to 12’ 12’1” to 14’ 14’1” to 16’ 16’1” to 18’ CONNECTION DETAILS ON-CENTER ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to10’ 10’1” to 12’ 12’1” to 14’ 14’1” to 16’ 16’1” to 18’ ...
-
Consumption & Display Application Packet
Administration | PageWC5: WC6: WC7: WC8: WC9: WC10: WC11: WC12: WC13: WC16: WC14: WC15: WC18: WC17: WC19: WC20: WC21: WC22: ... stockholders. For a Club, one of the club officers shall execute this application for all the members. If ... Partner, Officer, Club Officer) for and in behalf ...
-
Garages: One Story
Community Development | Page12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ... POST FASTEN TOP PLATED TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3’ O.C. TYP. MAX. HEIGHT 10’ 1000 ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ...
-
Public Utilities Financial Reports
Public Utilities | PageCombining Schedules of Revenues and Expenses 43 Electric Department – Detailed Schedule of Revenues and ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ...
-
Building Plans
Community Development | Pageetc.- 4- EXISTING DWELLING 16’ 6” 13’ PIN NEW FOOTING TO EXISTING CENTER PAD 24” X 24” 10” DEEP 8” x 20” ... ¾ Inch T&G Plywood over 2X10 Floor Joists, #2 Hem-Fir – 16” o.c. 2X6 Bottom Plate 2X6 Studs, 16” o.c. ... plans. The purpose of the plans is to provide a detailed written document of the scope of your project. ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Page2 (next 4,000 gal) Per # of Units $4.16 / 1,000 gal. $ 5.25 / 1,000 gal. $6.58 / 1,000 gal. $10.51 / 1,000 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ...
-
2022 Cost of Service Studies
Public Utilities | Page$3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... approximately 5.4% from 2022. There are some additional small changes recommended for certain rates as detailed ... properly passed through to retail electric customers. Exhibit 2-A is a detailed listing of GRPUC’s ...
-
Sales Tax Fact Sheet
Administration | PageCounty 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... Sales and Use Tax 10/1/19 0.50% Blue Earth County Transit Sales and Use Tax 4/1/16 0.50% Brainerd Sales ... and Use Tax 10/1/17 0.50% Cass County Transit Sales and Use Tax 4/1/16 0.50% Chisago County Transit ...
-
Basic Wood Framing
Community Development | PageLaterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...
-
Waste Management
Engineering / Public Works | Page5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...