Page not found

Search results

  1. Data Request

    Police | Page

    $44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ...

  2. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16c ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 2424 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 19.2” O.C. 8-9 11-6 14-1 16-3 24” O.C. 8-1 10-3 12-7 14-7 GIRDER SPANS AND HEADER SPANS FOR EXTERIOR ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ...

  4. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ...

  6. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... number of permits issued, the 2021 total of 526 permits was below the 10 year average of 550. We expect ... blank- 10 GRAND RAPIDS, CITY OF PRINCIPAL CITY OFFICIALS AND DEPARTMENT HEADS December 31, 2021 Term ...

  7. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ...

  8. Decks

    Community Development | Page

    12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 2447” Joists must bear ... 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 2447” 3 MAXIMUM POST HEIGHT IN FEET SPECIES SIZE ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  9. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    nature of the default and Lessor shall have not cured such default within ten (10) days after receipt of ... such default is of a character as to reasonably require more than ten (10) days to cure. 17.2 Except ... notice specifying the nature of default and Lessee shall have not cured such default within ten (10) days ...

  10. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

Pages