  1. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 3 2021/AP-1 170,000170,000Beacon Relocation 1 2022/AP-1 20,00020,000Airfield Lighting Replacement 3 2022/AP-2 ...

  2. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ...

  6. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... number of permits issued, the 2021 total of 526 permits was below the 10 year average of 550. We expect ... blank- 10 GRAND RAPIDS, CITY OF PRINCIPAL CITY OFFICIALS AND DEPARTMENT HEADS December 31, 2021 Term ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    nature of the default and Lessor shall have not cured such default within ten (10) days after receipt of ... such default is of a character as to reasonably require more than ten (10) days to cure. 17.2 Except ... notice specifying the nature of default and Lessee shall have not cured such default within ten (10) days ...

  8. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    egistarT"' AIRPORT LAND LEASE AGREEMENT THIS AGREEMENT, made and entered into this day of 20_, by and between ... Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ...

  10. Basic Wood Framing

    Community Development | Page

    — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 2 2-2×10 6-6 2 5-7 2 5-0 2 2-2×12 7-6 2 6-6 2 5-10 3 3-2×8 6-8 1 5-9 2 5-2 2 3-2×10 8-2 2 7-0 2 6-4 ...