Page not found
Search results
-
Data Request
Police | PageAuthorized Signature: Date: NOTARY PUBLIC Acknowledged before me this day of, 20. Signed: 9 Approved by the ... – receptions/parties $1,200.00 per day – commercial Miner’s Pavilion $20.00 per hour – sports $100.00 half day event ... $44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24/36 ...
-
Distributed Energy Resources
Public Utilities | PageSimplified Process (under 20kW capacity) c. Fast Track Process (see applicability within) d. Study Process (see applicability within) 2. ... Terminology .................................................................................................................. 2 1.1. Distributed ... Position ................................................................................................................. 8 4.8. Site ...
-
Public Utilities Financial Reports
Public Utilities | Page2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ...
-
2023 Adopted Levy and Tax Rate
Finance | PageLevy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ... 25,000 25,000 15,000 20,000 Special Levies----- Total Levy Required for Operations 6,019,239 6,098,764 ... CERTIFIED LEVY 7,689,023 7,793,670 8,079,328 8,603,265 8,603,265 3.79% 1.36% 3.67% 6.48% 0.00% TAX CAPACITY ...
-
Basic Wood Framing
Community Development | Page9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ... SPF 9-5 14-9 18-9 22-11 ROOF FRAMING Rafters Ceiling joists Collar ties – 1X4 min spaced 48” o.c. max. ...
-
Waste Management
Engineering / Public Works | Page5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...
-
2022 Cost of Service Studies
Public Utilities | Page19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... 2.0% 53.3% Lighting 1.1% 1.2%-7.8% Total 100.0% 100.0% 0.0% Cost-of-Service- 7- As indicated above, ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmegistarT"' AIRPORT LAND LEASE AGREEMENT THIS AGREEMENT, made and entered into this day of 20_, by and between ... Fuli Detail I I!.ilt_\C1,4 t;..11.i: City Council Work Session Monday, June 25, 2012 4:00 PM Conference ... Item Status: CC Worksession File created: 6/11/2012 In control: City Council Work Session On agenda: ...
-
Footings, Foundations & Slabs
Community Development | Pagegarage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... shall be attached to the sill with a 20 gage metal angle clip at 24 inches on center, with five 8d nails ... exists: 1. Walls are subject to hydrostatic pressure from groundwater. 2. Walls supporting more than 48 ...