Page not found

Search results

  1. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x12 3-2x12 ENG BM 16’ 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. Footings, Foundations & Slabs

    Community Development | Page

    over light frame or 8-inch hollow concrete masonry 1-story 12 12 12 2-story 21 16 12 3-story 32 24 16 ... 5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32 ... @ 72” #6 @ 72” #6 @ 64” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 32” #6 @ 24” #6 @ 16” #4 @ 56” #4 @ 56” ...

  4. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ...

  5. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  6. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ...

  7. Fasteners

    Community Development | Page

    ⅛ 3/32 #10 ⅜ 3/16 ⅛ 7/64 #11 ½ 3/16 5/32 9/64 #12 ½ 7/32 9/64 ⅛ Corrosion Resistant Nails Stainless Steel ... 6 12 19/32 – 1 8d common nail 6 12 1 1/8 – 1 ¼ 10d common nail or 8d deformed nail 6 12 a. All nails ... common nails; staples 16 ga., 1 ½“ long 3 6 25/32“ structural cellulosic fiberboard sheathing 1 ¾“ ...

  8. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... 12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ...

  9. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  10. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ...

Pages