Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 125,563 17,900 35,071 28,763 19,593 23,858 16,800 16,800 16,800 16,800 16,800 CSC Building/Grounds ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  5. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ... Central School Statement 28 145 Airport Operations Statement 29 146 IRA Civic Center Statement 30 147 ...

  6. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    M9RgagelNete Mortgage Satisfied 381NW1stAve 7/5/2017 Chris Marinuesi 68 28; 223:96 111, E12 3450 1j9L16 24, ... 5 year term Ernie Jacobson Fam. Frost CBD New Roof 35, 000L0 13-Jul-16 306.52 1- Jul-28 N/A 2nd Mortgage/ ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  7. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...

  8. Footings, Foundations & Slabs

    Community Development | Page

    garage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... during the first 28 days. Strength of concrete also increases as the water-cement ratios decrease. While ... Mixtures Are Not Available Specified 28-day compressive strength, f’c psi Water-cement ratio by weight ...

  9. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to1010’1” to 12’ 12’1” to 14’ 14’1” to 1616’1” to 18’ ... SHEATHING AND ½” STACKED WASHERS2,8 36 36 29 24 21 18 16 1 The tip of the lag screw shall fully extend ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... 2025Category Project # Priority Airport Improvements 2020/AP-2 3,896,6623,896,662RWY 16/34- Reconstruction ...

Pages