  1. Footings, Foundations & Slabs

    Community Development | Page

    5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32” ... bottom surface may slope not to exceed 1 unit vertical to 10 units horizontal. Footings must be stepped ... footing will exceed a slope of more than 1:10 (R403.1.5). FOOTINGS ON OR ADJOINING SLOPES Special care ...

  2. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  4. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  5. Decks

    Community Development | Page

    8’ 10’ 12’ 14’ 16’ 18’ Southern Pine 2-2X6 7’1” 6’2” 5’6” 5’0” 4’8” 4’4” 4’1” 2-2X8 9’2” 7’11” 7’1” ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ... 3’8” 2-2X10 8’4” 7’3” 6’6” 5’11” 5’6” 5’1” 4’8” 2-2X12 9’8” 8’5” 7’6” 6’10” 6’4” 5’11” 5’7” 3-2X6 7’4” ...

  6. Basic Wood Framing

    Community Development | Page

    2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ... o.c. Hem Fir 4-8 6-9 8-7 10-6 SPF 4-8 6-11 8-9 10-8 OTHER FRAMING HANDOUTS Other handouts are available ...

  7. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Table 10 178 Ratios of General Bonded Debt Outstanding Table 11 179 Direct and Overlapping Governmental ... Council and overseeing the day-to-day operations of the City. Council members serve four-year staggered ...

  8. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    in trip arrangements, and group travel may take 10-21 days. Muslim employees may choose to make ... shower at home. School administrators may discuss with students alternative clothing in phys- ical ... swimming skills have offered outside certification as an option. Muslim Holidays There are several days in ...

  9. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S S M T W TH F S S M T W TH F S 1 1 2 3 2 3 4 5 6 7 8 1 2 3 4 5 6 4 5 6 7 8 9 10 9 10 11 12 13 14 15 7 8 9 10 ...

  10. 2022 Cost of Service Studies

    Public Utilities | Page

    9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...