Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Energy Resource ............................................................................................ 2  1.2.  Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2  ...  Interconnection Coordinator .................................................................................... 3  2.3.  Interconnection ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Schedule of Changes in Utility Plant 57 Schedule of Changes in Accumulated Depreciation 58 Schedule of ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ...

  3. Waste Management

    Engineering / Public Works | Page

    11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    12-57 by consent roll call 15. Appointment of Michael Liebel to the position of 2nd Assistant Fire Chief ... 12°Io per annum, on all rentals and other sums due Lessor hereunder not paid within thirty (30) days ... were present: Discussion Items 1. 12-0384 Discussion with Representative Tom Anzelc. 2. 12-0399 Discuss ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Other 43,995 12,127 57,645 7,031 5,922------ Total Distribution Expenses 999,552$ 759,727$ 1,015,553$ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  6. Data Request

    Police | Page

    x 12" Photo Prints $10.00 base plus $0.25/photo Photo Copy-material provided by person making request  ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... signature notarized. Signed: Acknowledged before me on this________ day of_________, ...

  7. Community Development Fee Schedule

    Community Development | Page

    Z community_development_fee_schedule_7-1-15_final-most_current.pdf COMMUNITY DEVELOPMENT Fee Schedule (as of July 1, 2015) Building Permits $1.00- $500.00 $23 ... .50* $501.00- $2,000.00 $23.75* for the first $500.00 plus $3.50 for each additional $100.00 or fraction ... negotiate this component of the building permit fee with the project owner/developer. (revised 4-12 ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ...

  9. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    52 RremisseFy Nete Refinanced/Extended ShelerrRlake GK 23, 000. 00 1jut 06 127:57 4 dun 13 16,,589.42 ... 23, 246.95 Fank Perendy G99 nderieF-Remedel 1$ 582.75 18 Feta 12 114. 62 1 Aug 17 15;610:18 tad ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  10. Basic Wood Framing

    Community Development | Page

    2 2-2×10 6-6 2 5-7 2 5-0 2 2-2×12 7-6 2 6-6 2 5-10 3 3-2×8 6-8 1 5-9 2 5-2 2 3-2×10 8-2 2 7-0 2 6-4 ... 5-7 2 4-11 2 4-5 3 3-2×10 6-10 2 6-0 2 5-4 2 3-2×12 7-11 2 6-11 2 6-3 2 4-2×8 6-6 1 5-8 2 5-1 2 4-2×10 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

Pages