Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ... 4 – 5 Notes to Financial Statements 6 – 36 Required Supplementary Information Schedule of Proportionate Share ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  3. Decks

    Community Development | Page

    11 10 ½” DIAM. BOLT WITH 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SHEATHING AND ½” STACKED WASHERS2,8 36 36 29 24 21 18 16 1 The tip of the lag screw shall fully extend ...

  4. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16c ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 2424 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ...

  5. Data Request

    Police | Page

    $44.78 $47.58 $48.98 Institutional $39.72 $42.20 $43.44 City Map $10.00 Prints: 24/24 $3.50 each 24/36 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ...

  6. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ...

  7. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Agreement This Agreement is made and executed this 24th day of April, 2008, by and between the Charles K. ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... 2019 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand Rapids ...

  8. Rental Housing Code

    Community Development | Page

    owner shall be required to register units within ten (10) days after acquiring them. Fee Schedule The ... residential -  $150/annual Multi-Unit Residential Buildings 3-6 units -  $200 per bldg/annual 7-10 units -  $300 ... application is received within 60 days, starting October 15, 2021. Other applicable fees as listed in the fee ...

  9. Rental Housing Code

    Community Development | Page

    owner shall be required to register units within ten (10) days after acquiring them. Fee Schedule The ... residential -  $150/annual Multi-Unit Residential Buildings 3-6 units -  $200 per bldg/annual 7-10 units -  $300 ... application is received within 60 days, starting October 15, 2021. Other applicable fees as listed in the fee ...

  10. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... is shown at the end of Exhibit 2-A and in Table 2-4 below. A projected strong net income in 2022 is ... million or 16.3 percent of operating revenues. Projected Operating Results – Existing Rates- 7- Table 2-4 ...

Pages