Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

  2. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  4. Electric Distribution

    Public Utilities | Page

    kV to 22.9 kV substation was constructed in 2005 at the cost of $2.3 million dollars and financed ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  5. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ... 7’ 8’ 9’ 10’ 11’ 12’ 13’ 14’ 6” 2-2X6 2-2X6 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2X10 ...

  6. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    — 3/ 1/ 23 Mike Korte — 3/ 1/ 22 Chris Lynch — 3/ 1/ 19 Sholom Blake — 3/ 1/ 19 GRAND RAPIDS ECONOMIC ... Groom, Recorder GREDA Regular Meeting 2 Thursday, February 28, 2019 DATE: 03/ 22/ 2019 TIME: 11: 08: 07 ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 71,303 Overhead lines 139,379 122,630 177,900 174,777 236,987 22,000 23,100 23,793 24,507 25,242 25,999 ... contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ...

  8. 2023 Electric Security Light Rates

    Public Utilities | Page

    Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    ADJOURN Attest: Shawn Gillen, City Administrator CITYOF GRAND RAPIDS Page 1 Printed on 6/22/2012 CITY OF ... Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... 1 Printed on 8/22/2012 City Councii Meeting Agenda Full Detail June 25, 2012 3. 12-0387 Authorizing the ...

  10. Basic Wood Framing

    Community Development | Page

    (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ...

Pages