Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Schedule of Changes in Utility Plant 57 Schedule of Changes in Accumulated Depreciation 58 Schedule of ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    amaFi. ed 10 y 1 3/27/2015 MRM Management (MeAdly) GRD 32,698:67 19 Nov 13 19841 1 Bas 18 27; 02150 2nd ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... 2019 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand Rapids ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  5. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  7. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to1010’1” to 12’ 12’1” to 14’ 14’1” to 16’ 16’1” to 18 ... ” 11’0” 12’1” 11’0” 9’2” 2X10 18’0” 16’1” 13’5” 15’5” 13’9” 11’3” 2X12 21’9” 19’0” 15’4” 18’5” 16’0” 13’0” ...

  8. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  9. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Statement 18 110 Notes to Required Supplementary Information 111 CITY OF GRAND RAPIDS, MINNESOTA TABLE OF ...

  10. Basic Wood Framing

    Community Development | Page

    2 2-2×10 6-6 2 5-7 2 5-0 2 2-2×12 7-6 2 6-6 2 5-10 3 3-2×8 6-8 1 5-9 2 5-2 2 3-2×10 8-2 2 7-0 2 6-4 ... 5-7 2 4-11 2 4-5 3 3-2×10 6-10 2 6-0 2 5-4 2 3-2×12 7-11 2 6-11 2 6-3 2 4-2×8 6-6 1 5-8 2 5-1 2 4-2×10 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

Pages