Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Fuli Detail I I!.ilt_\C1,4 t;..11.i: City Council Work Session Monday, June 25, 2012 4:00 PM Conference ... Item Status: CC Worksession File created: 6/11/2012 In control: City Council Work Session On agenda: ... Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...

  5. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S S M T W TH F S S M T W TH F S 1 1 2 3 2 3 4 5 6 7 8 1 2 3 4 5 6 4 5 6 7 8 9 10 9 10 11 12 13 14 15 7 8 9 10 ...

  6. Veteran's Park

    Facilities | Page

    Veteran's Park is located at 10 NE 8th Ave, Grand Rapids, MN. The park has many amenities ... (5) business days from date of approval.                                     IMPORTANT:  R e servation ... will be canceled if payment is not received within five (5) days of approval.    ALCOHOL CONSUMPTION:  ...

  7. Basic Wood Framing

    Community Development | Page

    1 2-2×6 3-6 2 3-1 2 2-9 2 2-2×8 4-6 2 3-11 2 3-6 2 2-2×10 5-6 2 4-9 2 4-3 2 2-2×12 6-4 2 5-6 3 5-0 3 3-2×8 ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ...

  8. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Groom, Recorder GREDA Regular Meeting 2 Thursday, February 28, 2019 DATE: 03/ 22/ 2019 TIME: 11: 08: 07 ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... 2019 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand Rapids ...

  9. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  10. Decks

    Community Development | Page

    Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’104’6” 4’1” ... 6’8” 6’0” 5’6” 5’1” 4’9” 4’6” 3-2X8 9’8” 8’6” 7’7” 6’11” 6’5” 6’0” 5’8” 3-2X10 12’0” 10’5” 9’4” 8’6” ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

Pages