Page not found
Search results
-
Footings, Foundations & Slabs
Community Development | Page@ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 40” 10 feet 4 feet (or less) ... bottom surface may slope not to exceed 1 unit vertical to 10 units horizontal. Footings must be stepped ... footing will exceed a slope of more than 1:10 (R403.1.5). FOOTINGS ON OR ADJOINING SLOPES Special care ...
-
Distributed Energy Resources
Public Utilities | Pagewithin ten (10) Business Days. This notification shall include a written list detailing all information that must be provided to complete the Interconnection Application. ... Depending on the process track the Interconnection Customer has between five (5) and ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...
-
Public Utilities Financial Reports
Public Utilities | Page– Schedule of Expenses 55 Combined Schedule of Administrative, General and Customer Accounts Expense 56 ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...
-
Sales Tax Fact Sheet
Administration | PageCounty 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... 10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ...
-
Data Request
Police | Pagea period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmDepartment 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...
-
City Council Regular Meeting
City Council | Calendar Event | 01/13/14 04:00pmTOTALFLEETMAINTENANCE5,896.51 POLICE 0116610APPLIEDCONCEPTSINC117.56 12/10 ... TOTAL2011CIP/GAAPRONDESIGN477.86 8/10APRONDESIGN/GARECONST 2000425TKDA2,620.56 TOTAL8/10APRONDESIGN/GARECONST2,620.56 ... POLICE 0116610 APPLIED CONCEPTS INC 117. 56 12/ 10/ 13- 1/ 6/ 14 INVESTMENTS- 0- GRAND RAPIDS CITY ...
-
2022 Cost of Service Studies
Public Utilities | Page9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...
-
Stormwater Credits Policy
Engineering / Public Works | PageUtility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ...
-
City Council Regular Meeting
City Council | Calendar Event | 05/14/12 04:00pmcitycouncil_agenda_2012-05-14.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_closed_2012-05-14.pdf 01"./2(13 0"%#, ... D"@B?8citycouncil_worksession_2012-05-14.pdf CITY OF GRAND RAPIDS CCHAMBEs 420 NORTH POKEGAMA AVE. n. Meeting Agenda Full DetailGRAND Ft1PIDS ...