Page not found
Search results
-
Utility Information
Engineering / Public Works | PageCommercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month. ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ...
-
Data Request
Police | Page$0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... signature notarized. Signed: Acknowledged before me on this________ day of_________, ...
-
Water Treatment & Distribution
Public Utilities | Pagetreating 3.24 million gallons of water per day. Water treatment consists of aeration, gravity filtration, ... and zeolite softening. Treated water is stored in a 0.5 million gallon underground water reservoir and ...
-
Sales Tax Fact Sheet
Administration | Pagesales tax. What’s New April 1, 2022: Koochiching County will have a 0.5% Transit Sales and Use Tax ... January 1, 2022: Roseau County has a 0.5% Transit Sales and Use Tax October 1, 2021: Washington County ... Transit Sales and Use Tax increased to 0.5% Mankato has a 3.0% Lodging Tax April 1, 2021: Le Sueur ...
-
2023 Rural Electric Service Rate Schedule
Public Utilities | Page05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...
-
2023 City Electric Interim Annexation Areas Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... Effective 05/01/2021 ...
-
Stormwater Credits Policy
Engineering / Public Works | PageOrdinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ...
-
Footings, Foundations & Slabs
Community Development | Pagegarage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... exists: 1. Walls are subject to hydrostatic pressure from groundwater. 2. Walls supporting more than 48 ... GM, GC, SM-SC & ML SC, MH, ML-CL & ICL 30 45 60 250 370 490 72 72 48 9’ 0” 8’ 4” GW, GP, SW ...
-
2023 City Electric Service Rate Schedule
Public Utilities | PageAdopted 12/18/2019 Effective 05/01/2021 ...
-
2023 Electric Vehicle Service Rate Schedule
Public Utilities | Page12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... Effective 05/01/2021 I\...l--"--...l-i ""l /-i O /"'11"\-i I"\ ...