Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  2. Permit Fee Calculator

    Community Development | Page

    $31,835.00 State did plan review 25% plan review fee: $2,987.54 $22,872.39 $5,000,001.00 AND OVER Project ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 2  2.2.  DER ...   Interconnection Coordinator. Official definitions of each entity are defined in the  Glossary (Section 13). Additional details are explained in the subsections below.    2.2 ...

  4. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  5. Decks

    Community Development | Page

    Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ... building plans. Building permits are typically processed within 5 business days of receiving a complete set ... 2- 12d nails are recommended on nominal 2-inch decking. 10d nails are recommended for 5/4 ...

  6. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    ADJOURN Attest: Shawn Gillen, City Administrator CITYOF GRAND RAPIDS Page 1 Printed on 6/22/2012 CITY OF ... 1 Printed on 8/22/2012 City Councii Meeting Agenda Full Detail June 25, 2012 3. 12-0387 Authorizing the ... SETTING OF REGULAR AGENDA p.m. CITYOF GRAND RAPIDS Page 2 Printed on 6/22/2012 City Council Meeting Agenda ...

  8. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... approximately 5.4% from 2022. There are some additional small changes recommended for certain rates as detailed ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    20121AP-2 1 201,445 201,445 Airport Capital Fund Balance 54,649 54,649 CIP Fund 6,250 6,250 Itasca County ... 19,100 19.100 Ciry Wide OverlaysUrban 2014/2011 1 54Q000 540,000 Assessments 100,000 100,000 GO Bonds ... 7,200 7,200 Golf Course Greens Aerifier 2012IGG2 2 22,000 22,000 GoH Course EMerprise Fund 22,000 22 ...

  10. Basic Wood Framing

    Community Development | Page

    (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

Pages