Page not found

Search results

  1. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  4. Public Information Requests

    Administration | Page

    preparing or supplying the summary data. This should be done within 10 days after receiving the request. If ... the summary data cannot be prepared within 10 days, the Responsible Authority must notify the ... Within 30 days, 7 Approved by the City Council on xx/xx/03 the Responsible Authority or designee must ...

  5. Stormwater Credits Policy

    Engineering / Public Works | Page

    Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ...

  6. Utility Information

    Engineering / Public Works | Page

    Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ... section 1.0 through 1.6) to finance the City’s Stormwater Management Program. In addition, the Utility ...

  7. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Carpet Replacement‐Third Floor 28 Library Upgrades 29‐34 Carpet Replacement‐Council Chambers 35 Central School Upgrades 36‐54 ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 690 24 $5.71 $3.99 $141.03 0 96 97 192 193 720 over 720 25 $5.71 $3.99 $146.74 0 100 101 200 201 ...

  9. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  10. Decks

    Community Development | Page

    2- 12d nails are recommended on nominal 2-inch decking. 10d nails are recommended for 5/4 ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ... 7’10” 7’4” 6’11” 3-2X12 13’11” 12’1” 10’9” 9’10” 9’1” 8’6” 8’1” MAXIMUM DECK BOARD SPANS 5/4 AND 2X4 ...

Pages