Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ...

  2. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 1 2022/PD-1 18,00018,000New Canine 2 2022/PW-1 360,000360,000Snowplow Truck W/V-Box 1 2022/PW-2 42 ... Year Plan Summary 17 IRA Civic Center Improvements 18 Forest Lake/YMCA Outdoor Rink 19 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...

  4. Financial Reports

    Finance | Page

    Governmental Funds to the Statement of Activities Statement 5 42 Statement of Net Position- Proprietary Funds ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Statement 18 110 Notes to Required Supplementary Information 111 CITY OF GRAND RAPIDS, MINNESOTA TABLE OF ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  6. Garages: One Story

    Community Development | Page

    4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... must be attached with a minimum of 6d nails at 12 inches on center.  4X8 structural fiberboard ...

  7. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... /14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 2023 Electric Rural Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ...

  8. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to10’ 10’1” to 1212’1” to 14’ 14’1” to 16’ 16’1” to 18 ... ’10” 11’0” 12’1” 11’0” 9’2” 2X10 18’0” 16’1” 13’5” 15’5” 13’9” 11’3” 2X12 21’9” 19’0” 15’4” 18’5” 16’0” 13’0” ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    HEARINGS p.m. Recess regular meeting for 1st scheduled public hearing. 18. 12-0392 Conduct a public hearing ... transfers. Adopted Resolution 12-58 by consent roll call 18a. Approve Separation & Release Agreement with ... were present: Discussion Items 1. 12-0384 Discussion with Representative Tom Anzelc. 2. 12-0399 Discuss ...

  10. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ...

Pages