Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ... over 1,260 43 $5.71 $3.99 $249.52 0 172 173 344 345 1,290 over 1,290 44 $5.71 $3.99 $255.23 0 176 177 ...

  4. Data Request

    Police | Page

    Statute 5-21-09) Mufflers 169.69 (Add) Hitching 169.46 (Add) $60.00* (as allowed by State Statute 5-21-09 ... Signature: Date: Date Notified:data_practices_procedures_adopted_1-23-23.pdf 1 Approved by the City Council ... Signature:city_fee_schedule_-_adopted_1-23-23.pdf DEPARTMENTAL FEE SCHEDULE FOR CITY SERVICES Effective Date: 01/23/2023 CITY WIDE FEES Photo copy ...

  5. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... rates is summarized in Table 2-3. A detailed presentation of the operating results is shown in Exhibit ... 2-A. Section 2- 6- Table 2-3 Projected Operating Results Existing Rates Year 2022 2023 2024 2025 2026 ...

  7. Structural Engineers Reports

    Administration | Page

    changed / increased. 3. The required uniform snow load for this building is now 46 psf. (an increase of ... design snow load for this roof structure is approximately 92 psf maximum near the eave to 23 psf at the ... which means that current 46 psf design load is approximately 2 to 3 feet of snow] 5. Under the current ...

  8. Economic Development Authority Meeting

    Economic Development Authority | Calendar Event | 09/23/21 04:00pm

    Meeting with Agenda and Minutes Thursday, September 23, 2021- 4:00pm Agenda Minutes Video Image ... GRAPIDSMN crivers@agendapal.com 387951de-aca8-4ceb-a09f-6ea1dd345e38 Sort A to Z Agenda (HTML) Agenda Packet ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Meetinq 5:09 CONSENT AGENDA p.m. Any item on the consent agenda shall be removed for consideration by ... Councilor Joe Chandler, and Mayor Dale Adams 5:35 PUBLIC WORKS DEPARTMENT p.m. 23• Consider awarding a five ... s Grand Rapids, MN 55744 > 'L18-326-3477 FAX: 218-326-46&3 May 31, 2012 Chief Jim Denny Grind ...

  10. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23 ... Analysis 23 Basic Financial Statements: Government-Wide Financial Statements: Statement of Net Position ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

Pages