Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28,000 ...

  3. Financial Reports

    Finance | Page

    (ACFR) for the fiscal year ended December 31, 2020. This was the twenty-ninth consecutive year that the ... Report For the Fiscal Year Ended December 31, 2020 Executive Director/CEO 9- This page intentionally left ... comparative information presented herein as of and for the year ended December 31, 2020 is consistent, in all ...

  4. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 2025Category Project # Priority Airport Improvements 2020/AP-2 3,896,6623,896,662RWY 16/34- Reconstruction ... 50,000Airport Improvements Total Buildings 2020/FD-1 6,943,2956,943,295New Fire Hall/Police Evidence- 2020 ...

  5. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    PUBLIC FORUM COUNCIL REPORTS 5:08 APPROVAL OF MINUTES p.m. 12-0406 Approve Council minutes for June 11, ... Mclnerney to adopt City Ordinance 12-06-08 and publish in summary form. The motion carried by the following ... June 11, 2012 5:40 VERIFIED CLAIMS p.m. 24. Consider approving the verified claims for the period May ...

  6. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... Test Result Range of Detected Test Results Violation Typical Sources Fluoride 4.0 ppm 4.0 ppm 0.72 ppm ...

  7. Chicken Permit

    Administration | Page

    includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ... DECEMBER 31,_______ Adjacent Landowner Authorization: The following adjacent landowners, by their ...

  8. Permit Fee Calculator

    Community Development | Page

    $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ... $15.00 $745.37 Similar Plans 25% Plan Review Fee $110.66 $568.31 $50,001.00- $100,000.00 Project Cost ...

  9. 2023 Electric Security Light Rates

    Public Utilities | Page

    $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    Administrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ... 125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ... Bonds 31Q342 31Q342 Wednesdoy, May 09, ZO/1 Department Project # Priority 2012 2013 2014 2015 2016 Totat ...

Pages