Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... AMI and AMR data. SEH was hired in 2020 to complete updates to the Comprehensive Water and Wastewater ...

  2. 2023 Water Irrigation Rates

    Public Utilities | Page

    UTILITIES COMMISSION IRRIGATION WATER SERVICE RATE SCHEDULE Adopted: 03-08-2023 Effective/Billed After: ... 04-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer Charges Charges ...

  3. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... of 20 NO Corrosion of household plumbing. Copper (11/14/18) 0 ppm 90% of homes less than 1.3 ppm 1.04 ... Sources Nitrate 10 ppm 10.4 ppm 0.3 ppm N/A NO Runoff from fertilizer use; Leaching from septic tanks, ...

  4. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 690 24 $5.71 $3.99 $141.03 0 96 97 192 193 720 over 720 25 $5.71 $3.99 $146.74 0 100 101 200 201 ... 750 over 750 26 $5.71 $3.99 $152.45 0 104 105 208 209 780 over 780 27 $5.71 $3.99 $158.16 0 108 109 ...

  5. Data Request

    Police | Page

    on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...

  6. Administration

    Public Utilities | Page

    needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... expires 03/01/2027 Commissioner Rick Smith Term expires 03/01/2025 Commission President Tom Stanley Term ... expires 03/01/2024 Commissioner Nancy Saxhaug Term expires 03/01/2026 Commissioner / City Council Liason ...

  7. Financial Reports

    Finance | Page

    7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... With this relocation and expansion of the L&M Distribution Center, 30-45 new positions will be ... sites in this redevelopment began in the fall of 2020. A permit application has been submitted for ...

  8. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  9. Permit Fee Calculator

    Community Development | Page

    Calculator Sort A to Z ryans_permit_fee_calculator_2010.xlsx Sheet1 BUILDING PERMIT FEE CALCULATOR Mar-04 ... Similar plans 25% of permit fee $300.45 $1,569.75 $500,001.00- $1,000,000.00 Project Cost Permit Fee Plan ... plan review 25% plan review fee: $1,954.04 $15,178.89 $3,000,001.00- $4,000,000.00 Project Cost Permit ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018‐1, Block 19 Improvements ... capital improvement plan and the issuance of bonds thereunder. 1.03 The City has caused to be prepared the ...

Pages