Page not found

Search results

  1. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... AMI and AMR data. SEH was hired in 2020 to complete updates to the Comprehensive Water and Wastewater ...

  3. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... 7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... Capital Project Funds Statement 25 138 Subcombining Statement of Revenues, Expenditures and Changes in ...

  4. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Maintenance Five Year Plan Summary 24‐25 City Hall RTU #3 26 City Hall RTU #1 27 ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018‐1, Block 19 Improvements ...

  5. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  6. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... kWh/mo@ $0.1612/kWh All kWh/mo @ $0.0550/kWh standalone charqe 12/14/2022 01/01/2023 Minimum Bill Customer ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  7. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02/17/2021 ...

  8. Data Request

    Police | Page

    Pellet/Guns $50.00 PUBLIC WORKS Equipment Hourly rates: ** Pickups $25.00 Trucks / Plows $45.00 Heavy ... Transcript $25.00/hour Physical Copies- up to 100 pages $0.25/page Physical Copies- 101 pages or more ... Certification Service $5.00/Instance 3.5" x 5" Photo Prints $10.00 base plus $0.25/photo 8" ...

  9. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 hour lithium ion battery surrounded ... with the community. The new facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 ... power in April 2022. • Anticipated 25-year lifespan. Battery Energy Storage System • 1 MW-2.5 hour ...

  10. Administration

    Public Utilities | Page

    needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... expires 03/01/2027 Commissioner Rick Smith Term expires 03/01/2025 Commission President Tom Stanley Term ... expires 03/01/2024 Commissioner Nancy Saxhaug Term expires 03/01/2026 Commissioner / City Council Liason ...

Pages