Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  3. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  4. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23 ... Analysis 23 Basic Financial Statements: Government-Wide Financial Statements: Statement of Net Position ... Sheet- Nonmajor Debt Service Funds Statement 23 128 Subcombining Statement of Revenues, Expenditures and ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... rates is summarized in Table 2-3. A detailed presentation of the operating results is shown in Exhibit ... 2-A. Section 2- 6- Table 2-3 Projected Operating Results Existing Rates Year 2022 2023 2024 2025 2026 ...

  6. Basic Wood Framing

    Community Development | Page

    3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ... NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ... 2 2-2×4 2-7 1 2-3 1 2-0 1 CRAWL SPACES Treated joists if less than 18” to ground Treated plate Treated ...

  7. Administration

    Public Utilities | Page

    needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... expires 03/01/2027 Commissioner Rick Smith Term expires 03/01/2025 Commission President Tom Stanley Term ... expires 03/01/2024 Commissioner Nancy Saxhaug Term expires 03/01/2026 Commissioner / City Council Liason ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year Plan Summary of Project Costs ... 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    Regular Meeting Sort A to Z citycouncil_closed_2015-07-13.pdf 01"./2(13 455 ... DiscussperformanceevaluationforTomPagel, CityAdministrator, pursuanttoMinn. Stat. 13D.05 subds. 3(a), 13D.01, subd. 3. Sponsors: Indexes: ... 3(a), 13D.01, subd. 3. CITYOFGRANDRAPIDSPage1of1Printedon5/14/2021 ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    2012-2016 Amended Capital Improvement Plan. Adopted Resolution 12-53 by consent roll call 5 • Revoke and ... Councilor Joe Chandler, and Mayor Dale Adams 5:35 PUBLIC WORKS DEPARTMENT p.m. 23• Consider awarding a five ...

Pages