Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... AMI and AMR data. SEH was hired in 2020 to complete updates to the Comprehensive Water and Wastewater ...

  3. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23 ... Analysis 23 Basic Financial Statements: Government-Wide Financial Statements: Statement of Net Position ... Sheet- Nonmajor Debt Service Funds Statement 23 128 Subcombining Statement of Revenues, Expenditures and ...

  4. Arts & Culture Commission Meeting

    Arts & Culture Commission | Calendar Event | 11/01/22 03:45pm

    clyman@ci.grand-rapids.mn.us aa01bddd-e5f6-4f67-9e17-16fc155a39b1 Sort A to Z Agenda (HTML) Agenda Packet (HTML) ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... rates is summarized in Table 2-3. A detailed presentation of the operating results is shown in Exhibit ... 2-A. Section 2- 6- Table 2-3 Projected Operating Results Existing Rates Year 2022 2023 2024 2025 2026 ...

  6. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  7. Basic Wood Framing

    Community Development | Page

    1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ...

  8. Permit Fee Calculator

    Community Development | Page

    $1.00- $500.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $500.00 $23.50 $15.28 ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... review 25% plan review fee: $920.54 $7,085.39 $2,000,001.00- $3,000,000.00 Project Cost Permit Fee Plan ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    Regular Meeting Sort A to Z citycouncil_closed_2015-07-13.pdf 01"./2(13 455 ... DiscussperformanceevaluationforTomPagel, CityAdministrator, pursuanttoMinn. Stat. 13D.05 subds. 3(a), 13D.01, subd. 3. Sponsors: Indexes: ... 3(a), 13D.01, subd. 3. CITYOFGRANDRAPIDSPage1of1Printedon5/14/2021 ...

  10. Administration

    Public Utilities | Page

    needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... expires 03/01/2027 Commissioner Rick Smith Term expires 03/01/2025 Commission President Tom Stanley Term ... expires 03/01/2024 Commissioner Nancy Saxhaug Term expires 03/01/2026 Commissioner / City Council Liason ...

Pages