Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  3. 2023 City Water Rates

    Public Utilities | Page

    $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Effective/Billed After: 01-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ...

  4. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... X10 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2 ... X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x10 3-2x12 12’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2 ...

  5. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... attic assembly supported by 2 × 4 studs is limited to a roof span of 32 feet. Where the roof span ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  7. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23,613,662 ... and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ...

  8. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...

  9. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  10. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

Pages