Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...  Interconnection Coordinator .................................................................................... 3  2.3.  Interconnection ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... rates is summarized in Table 2-3. A detailed presentation of the operating results is shown in Exhibit ... 2-A. Section 2- 6- Table 2-3 Projected Operating Results Existing Rates Year 2022 2023 2024 2025 2026 ...

  5. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ... SPACING OF FASTENERS4,5 ½” DIAM. LAG SCREW WITH 15/32” SHEATHING1 30 23 18 15 13 11 10 ½” DIAM. BOLT WITH ...

  6. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  7. Financial Reports

    Finance | Page

    Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... Analysis 23 Basic Financial Statements: Government-Wide Financial Statements: Statement of Net Position ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  8. Garages: One Story

    Community Development | Page

    (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ...

  9. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... Signature: Date: Date Notified:data_practices_procedures_adopted_1-23-23.pdf 1 Approved by the City Council ... file □ Other: 11 Approved by the City Council on xx/xx/03 Notice to Persons Under Age 18 Exhibit C Some ...

  10. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

Pages