  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  3. Permit Fee Calculator

    Community Development | Page

    Calculator Sort A to Z ryans_permit_fee_calculator_2010.xlsx Sheet1 BUILDING PERMIT FEE CALCULATOR Mar-04 ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

  4. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

  5. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ... 12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ...

  6. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ...

  8. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04 ... /01/2022 Adopted 12/18/2019 Effective 05/01/2021 ...

  9. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  10. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 153 304 305 1,140 over 1,140 39 $5.71 $3.99 $226.68 0 156 157 312 313 1,170 over 1,170 40 $5.71 $3.99 ...

Pages