Page not found
Search results
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... a. Uniform Contract (under 40kW capacity) b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request) c. Certificate of Completion Detroit Lakes Public Utility’s 29.3 kW Select Solar ...
-
Public Utilities Financial Reports
Public Utilities | PageInvestment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ... in northcentral Minnesota, and is the county seat of Itasca County. On March 30, 1910, the Grand ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...
-
2021-2025 Amended Capital Improvement Plan
Finance | Page1 2021/P&R-1 10,977,00010,977,000IRA Civic Center Improvements 1 2021/P&R-2 40,98440,984Forest Lake/YMCA ... 50,00050,000Airport Zoning Update 2 CIP Fund 10,000 10,000 Itasca County 10,000 10,000 ST/MN-Airport 30,000 30 ... 2023 2024 2025Funding Sources 10,00010,000CIP Fund 10,00010,000Itasca County 30 ...
-
2022 Cost of Service Studies
Public Utilities | Pageprojected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...
-
Community Development Fee Schedule
Community Development | Page$96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... ” high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40.30 ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 ...
-
Data Request
Police | Pageover 30” high (non-enclosed) Attached Steps/Deck (non-enclosed) Covered porch (non-enclosed) $40.30 ... (new) $40.30 $26.20 $1.00 $67.50 Residential Window replacement $60.00 $1.00 $61.00 Furnace Replacement ... $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 $26.20 $1.00 $67.50 Replace sink, toilet, faucet, ...
-
2023 Electric Security Light Rates
Public Utilities | PageEffective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...
-
GROW Grand Rapids 2040 Comprehensive Plan
Community Development | Pagesignificant benefits. The top 10 are described here and listed in the box. 1. Provides legal justification for ... values 10 Provides an opportunity to consider future impacts of today’s decisions Under Construction::::: ... Range communities. Virginia, Minnesota Ca ro le Z el lie CO N SI D ER IN G T H E O PP O RT U N IT Y 10 ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/11/12 04:00pm17.26 25.44 37.63 26.78 Nordic 18.43 21.44 24.46 21.44 WM 17.49 21.15 25.25 21.30 Total Cost Per Month ... 17,553.60 96 Gal 37.63 x 170 6,397.10 44,369.28 Total Nordic 35 Gal 18.43 x 1183 21,802.69 64 Gal 21.44 ... x 690 14,793.60 96 Gal 24.46 x 170 4,158.20 40,754.49 Total Waste Manaement 35 Gal 17.49 x 1183 ...
-
Footings, Foundations & Slabs
Community Development | Pageand SP GM, GC, SM-SC & ML SC, MH, ML-CL & ICL 30 45 60 320 480 640 72 48 40 a. Sill plate ... @ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 40” 10 feet 4 feet (or less) ... 5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32” ...