Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...

  3. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... 7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  4. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...  Review Timelines .......................................................................................... 7  4.5.  Comparability ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... million or 16.3 percent of operating revenues. Projected Operating Results – Existing Rates- 7- Table 2-4 ...

  6. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 750 over 750 26 $5.71 $3.99 $152.45 0 104 105 208 209 780 over 780 27 $5.71 $3.99 $158.16 0 108 109 ... 2 (next 4,000 gal) Per # of Units $4.16 / 1,000 gal. $ 5.25 / 1,000 gal. $6.58 / 1,000 gal. $10.51 / 1,000 ...

  7. Decks

    Community Development | Page

    PERPENDICULAR TO JOIST OR 5/4 SOUTHERN PINE OR 2X6 AT 45 DEGREES TO JOIST 16” O.C. 5/4 AND 2X4 AT 45 DEGRESS TO ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to1010’1” to 12’ 12’1” to 14’ 14’1” to 1616’1” to 18’ ...

  8. Fasteners

    Community Development | Page

    10 ½ 83 113 88 16d 3 ½“ 8 45 10 69 93 74 20d 4” 6 30 9 50 65 53 30d 4 ½“ 5 20 9 45 Not usually ... end nail 2-16d--- Stud to sole plate, toe nail 3-8d or 2-16d--- Double studs, face nail 10d 24” o.c. ... Double top plates, face nail 10d 24” o.c. Sole plate to joist or blocking at braced wall panels 3-16d 16 ...

  9. Garages: One Story

    Community Development | Page

    12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ... POST FASTEN TOP PLATED TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3’ O.C. TYP. MAX. HEIGHT 10’ 1000 ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ...

  10. Sales Tax Fact Sheet

    Administration | Page

    County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... 10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ...

Pages