Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ...

  3. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

  4. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... 1 2021/P&R-1 10,977,00010,977,000IRA Civic Center Improvements 1 2021/P&R-2 40,98440,984Forest Lake/YMCA ... Beacon Relocation 13 Airfield Lighting Replacement 14 FBO Improvements 15 Airport Zoning Update 16 Buildings Five ...

  5. Footings, Foundations & Slabs

    Community Development | Page

    #6 @ 72” #6 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 24” #6 @ 16” #4 @ 56” #4 @ 56” #5 @ 56” #6 ... @ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 4010 feet 4 feet (or less) ... 5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32” ...

  6. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 2 (next 4,000 gal) Per # of Units $4.16 / 1,000 gal. $ 5.25 / 1,000 gal. $6.58 / 1,000 gal. $10.51 / 1,000 ...

  7. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Funds Statement 3 40 Statement of Revenues, Expenditures and Changes in Fund Balance- Governmental Funds ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ...

  8. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...

  9. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    14,792.40 26- 0ct-15 129. 61 N/ A N/A 2nd Mortgage/ Note SCDP Special Terms Pasties Plus Building doors 10 ... replacement 10 yr. @ 1% 104 NE 3rd Street 3AB Properties ULC CBID Exterior Repairs & Interior 40,00U0 in ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

  10. Community Development Fee Schedule

    Community Development | Page

    $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... $50,000.00 $391.65* for the first $25,000.00 plus $10.20* for each additional $1,000.00 or fraction thereof, ... to and including $50,000.00 $50,001.00 to $100,000.00 $650.20* for the first $50,000.00 plus $7.10 ...

Pages