Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. Basic Wood Framing

    Community Development | Page

    3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ... 5-7 2 4-11 2 4-5 3 3-2×10 6-10 2 6-0 2 5-4 2 3-2×12 7-11 2 6-11 2 6-3 2 4-2×8 6-6 1 5-8 2 5-1 2 4-2×10 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

  3. Decks

    Community Development | Page

    Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’115’4” 4’10” 4’6” 4’1” ... 7’10” 7’4” 6’11” 3-2X12 13’11” 12’1” 10’9” 9’10” 9’1” 8’6” 8’1” MAXIMUM DECK BOARD SPANS 5/4 AND 2X4 ... 2- 12d nails are recommended on nominal 2-inch decking. 10d nails are recommended for 5/4 ...

  4. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ... approximately 5.4% from 2022. There are some additional small changes recommended for certain rates as detailed ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  6. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... CP 2015‐1, City Wide Overlays‐Sylvan 111 CP 2018‐3, 10th St NE (3rd Ave to CDS) 112 CP 2018‐4, 11th St NE (2nd Ave to 3rd Ave) 113 ...

  7. Financial Reports

    Finance | Page

    Table 10 178 Ratios of General Bonded Debt Outstanding Table 11 179 Direct and Overlapping Governmental ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Fuli Detail I I!.ilt_\C1,4 t;..11.i: City Council Work Session Monday, June 25, 2012 4:00 PM Conference ... Item Status: CC Worksession File created: 6/11/2012 In control: City Council Work Session On agenda: ... Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ...

  10. Permit Fee Calculator

    Community Development | Page

    Review Fee State Surcharge Total Fee $630,000.00 $3,890.10 $2,528.57 $315.00 $6,733.66 State did plan ... review 25% plan review fee: $920.54 $7,085.39 $2,000,001.00- $3,000,000.00 Project Cost Permit Fee Plan ... Cost Permit Fee Plan Review Fee State Surcharge Total Fee $5,000,000.00 $18,384.85 $11,950.15 $1,500.00 ...

Pages