Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  3. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... 19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ...

  5. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ...

  6. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29 ...  Application ............................................................................................... 6  4.1.  Overview ...

  7. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  8. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    STORAGE facility on June 29, 2023 from 2 to 6 p.m. This event will take place on the project site at 2515 ... Ziegler Cat lithium ion battery. • Began operating in October 2022. • Operated by a comprehensive ...

  9. Data Request

    Police | Page

    Fee Re-roofing $60.00 $1.00 $61.00 Garage Door $40.00 $1.00 $41.00 Siding Replacement $60.00 $1.00 ... tub (minor repairs) $14.50 $1.00 $15.50 Residential & Commercial Demolitions $40.00* $1.00 $41 ... Single-Family $8.00 $8.50 $8.75 Multi-Family $29.24 $31.07 $31.98 Commercial $44.78 $47.58 $48.98 Industrial ...

  10. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... Commercial Demolitions (3-27-06) $40.00* $1.00 $41.00 Fireplaces & free standing stoves (Gas or Wood) ... (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ...

Pages