Page not found

Search results

  1. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17 ...

  2. Community Development Fee Schedule

    Community Development | Page

    (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... Permit Fee Plan Check Fee State Surcharge Fee Total Fee Re-roofing (12-17-12) $60.00 $1.00 $61.00 Garage ... Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Auditors' Report on Legal Compliance 88 INTRODUCTORY SECTION i May 17, 2023 Members of the Commission Grand ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  4. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... All kWh/mo@ $0.1111/kWh All kWh/mo @ $0.0557/kWh Demand: All kW@ $17.64/kW 12/14/2022 01/01/2023 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  5. 2023 Electric Security Light Rates

    Public Utilities | Page

    /2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02/17 ...

  6. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    16 $5.71 $3.99 $95.35 0 64 65 128 129 480 over 480 17 $5.71 $3.99 $101.06 0 68 69 136 137 510 over ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  7. Sales Tax Fact Sheet

    Administration | Page

    Winona County Transit Sales and Use Tax 1/1/17 0.50% Worthington Sales and Use Tax 1/1/20 4/1/09 ... County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ...

  8. 2022 Cost of Service Studies

    Public Utilities | Page

    125,563 17,900 35,071 28,763 19,593 23,858 16,800 16,800 16,800 16,800 16,800 CSC Building/Grounds ... 17.6% 18.0%-2.2% Demand & Energy 36.1% 35.4% 2.0% Industrial 9.7% 9.3% 3.8% Load Management 3.0% ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  9. Structural Engineers Reports

    Administration | Page

    State of Minnesota. Jon E. Aamodt, P.E. Date MN Reg. No. 24838 11-09-17 (see attached photos) 102 S. ... -665 Dear John, This report is intended to follow up on our previous reports dated 11-06-17 and 11-09- 17 ... discussed in our 11-09-17 report. The Original report summarizing our analysis of the roof structure dated ...

  10. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    17,716.00 1- Apr-18 241. 35 1- Mar-25 N/ A Security Agreement 66310 Great River Rd. 820 NE 4th St. GRB ... Street and furnace 10 yr. @ 1% JBS Holdings, LLC SGB Roof, heating system, and 35,000.00 14-Apr-17 306.50 ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ...

Pages