Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Assets 32,619,604$ 32,234,849$ 29,688,627$ 384,755$ 2,546,222$ Capital Assets 58,449,377 60,439,330 ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  4. Economic Development Authority Meeting-CANCELLED

    Economic Development Authority | Calendar Event | 04/14/22 04:00pm

    crivers@agendapal.com 15e4054e-6e60-4e07-8b29-2b4cdbcdc69d Sort A to Z Agenda (HTML) ...

  5. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    32, 000 29, 000 59,000) 5 Recreation Programs 49, 000 66, 000 17, 000 9, 000 6 Haz-Mat 50, 000 50, 000 ... citycouncil_agenda_2015-07-13.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_closed_2015-07-13.pdf 01"./2(13 455 ...

  6. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... attic assembly supported by 2 × 4 studs is limited to a roof span of 32 feet. Where the roof span ... exceeds 32 feet, the wall studs shall be increased to 2 × 6 or the studs shall be designed in accordance ...

  7. Decks

    Community Development | Page

    11 10 ½” DIAM. BOLT WITH 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. ... 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. SHEATHING AND ½” STACKED ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  8. Financial Reports

    Finance | Page

    Central School Statement 28 145 Airport Operations Statement 29 146 IRA Civic Center Statement 30 147 ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29 ...  .......................................................................................................................... 3  3.2.  Importance ...

  10. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    STORAGE facility on June 29, 2023 from 2 to 6 p.m. This event will take place on the project site at 2515 ... Ziegler Cat lithium ion battery. • Began operating in October 2022. • Operated by a comprehensive ...

Pages