Page not found

Search results

  1. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  2. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... $50,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $30,000.00 $442.65 $287.72 ...

  3. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    and Distribution 72 Water Distribution by Customer Class 73 Number of Water and Wastewater Collection ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  5. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ... (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ...

  6. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  8. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 2  2.2.  DER ...   Interconnection Coordinator. Official definitions of each entity are defined in the  Glossary (Section 13). Additional details are explained in the subsections below.    2.2 ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  10. Financial Reports

    Finance | Page

    and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... together with a parts distribution center. In September of 2019, 100% of the ASV shares were purchased by ...

Pages