Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ...

  2. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    wq-strm4-49a • 9/ /20 Page 12 of 32 MCM 4: Construction site stormwater runoff control • 651-296-6300 ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ...

  3. Basic Wood Framing

    Community Development | Page

    SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... 3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... constructed in 2018 for $1.4 million dollars. The electrical distribution system consists of 157 overhead and ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... 19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  6. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... must be attached with a minimum of 6d nails at 12 inches on center.  4X8 structural fiberboard ...

  7. Financial Reports

    Finance | Page

    General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ...

  8. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2X6 ... 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x10 3-2x12 12’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 ...

  9. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018 ...

Pages