Page not found
Search results
-
MPCA MS4 Permit Public Notice Copy
Engineering / Public Works | Pagewq-strm4-49a • 9/ /20 Page 12 of 32 MCM 4: Construction site stormwater runoff control • 651-296-6300 ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ...
-
Basic Wood Framing
Community Development | PageSUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... 3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Page24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ...
-
Public Utilities Financial Reports
Public Utilities | Pageexpense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...
-
2022 Cost of Service Studies
Public Utilities | Page29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... 19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...
-
Garages: One Story
Community Development | Page2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... must be attached with a minimum of 6d nails at 12 inches on center. 4X8 structural fiberboard ...
-
Decks
Community Development | Page22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2X6 ... 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x10 3-2x12 12’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 ...
-
Financial Reports
Finance | PageGeneral Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ...
-
Fasteners
Community Development | Page6 12 19/32 – 1 8d common nail 6 12 1 1/8 – 1 ¼ 10d common nail or 8d deformed nail 6 12 a. All nails ... ⅛ 3/32 #10 ⅜ 3/16 ⅛ 7/64 #11 ½ 3/16 5/32 9/64 #12 ½ 7/32 9/64 ⅛ Corrosion Resistant Nails Stainless Steel ... 12 gauge shank with a minimum 3/8” diameter head and of a length to penetrate through the roofing ...
-
Temporary 1-4 Day Liquor License Sales & Service
Administration | PageTextField1[2]: CheckBox1[0]: CheckBox2[0]: CheckBox3[0]: CheckBox4[0]: Organization[0]: CityOrganization[0]: ... Temporary licenses can be issued for: 1- 4 days, 12 days total per calendar year and not more than one event ... a Council meeting not less than 30 days prior to your scheduled event. Pay $20 license fee. Payment may be ...