Page not found
Search results
-
Stormwater
Engineering / Public Works | PageUtility Ordinance #04-08-10 (Ordinance Chapter 24 Section 1.0-1.6). This ordinance was originally ... approved at the August 9th, 2004, City Council Meeting and most recently updated at the May 8th, 2017 City ...
-
2023 Water Irrigation Rates
Public Utilities | PageUTILITIES COMMISSION IRRIGATION WATER SERVICE RATE SCHEDULE Adopted: 03-08-2023 Effective/Billed After: ... 04-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer Charges Charges ...
-
Economic Development Authority Regular Meeting
Economic Development Authority | Calendar Event | 02/08/18 04:00pm2017 REGULAR MEETING. The foil in favor thereof: S. Blake, Christy, Jackson, Stefan. Opposed: None, ... Minnesota Energy Resources $ 48. 09 P.U.0 $ 984.08 The Northspan Group Inc $ 1, 500.00 The following voted ... FEBRUARY 8, 2018 CITY OF GRAND RAPIDS DEPARTMENT SUMMARY REPORT INVOICES DUE ON/ BEFORE 02/ 08/ 2018 PAGE: ...
-
Permit Fee Calculator
Community Development | PageCalculator Sort A to Z ryans_permit_fee_calculator_2010.xlsx Sheet1 BUILDING PERMIT FEE CALCULATOR Mar-04 ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...
-
2023 Electric Security Light Rates
Public Utilities | Page$13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...
-
Sales Tax Fact Sheet
Administration | PageAnoka County 10/1/2017 Beltrami County 4/1/2014 Carlton County 4/1/2015 Carver County 10/1/2017 Dakota ... County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ...
-
2023 Load Management Electric Service Rate Schedule
Public Utilities | Page8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ...
-
2022 Cost of Service Studies
Public Utilities | Pageprojected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...
-
Community Development Fee Schedule
Community Development | Pagenegotiate this component of the building permit fee with the project owner/developer. (revised 4-12-04 ... Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40 ...
-
2023 City Electric Interim Annexation Areas Service Rate Schedule
Public Utilities | PageRATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...