Page not found

Search results

  1. Community Development Fee Schedule

    Community Development | Page

    negotiate this component of the building permit fee with the project owner/developer. (revised 4-12-04 ... Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40 ...

  2. Grand Rapids Monitoring Results

    Public Utilities | Page

    of 20 NO Corrosion of household plumbing. Copper (11/14/18) 0 ppm 90% of homes less than 1.3 ppm 1.04 ... Sources Nitrate 10 ppm 10.4 ppm 0.3 ppm N/A NO Runoff from fertilizer use; Leaching from septic tanks, ... Test Result Range of Detected Test Results Violation Typical Sources Fluoride 4.0 ppm 4.0 ppm 0.72 ppm ...

  3. Data Request

    Police | Page

    on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... problems in obtaining access to data may be directed. 2 Approved by the City Council on xx/xx/03 Categories ...

  4. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 690 24 $5.71 $3.99 $141.03 0 96 97 192 193 720 over 720 25 $5.71 $3.99 $146.74 0 100 101 200 201 ...

  5. Permit Fee Calculator

    Community Development | Page

    Calculator Sort A to Z ryans_permit_fee_calculator_2010.xlsx Sheet1 BUILDING PERMIT FEE CALCULATOR Mar-04 ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

  6. 2023 Water Irrigation Rates

    Public Utilities | Page

    UTILITIES COMMISSION IRRIGATION WATER SERVICE RATE SCHEDULE Adopted: 03-08-2023 Effective/Billed After: ... 04-01-2023 Applicable within the corporate limits of the City of Grand Rapids: Customer Charges Charges ...

  7. 2023 Electric Security Light Rates

    Public Utilities | Page

    $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...

  8. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    8.40 8.40 8.40 (9.83) (9.83) (19.73) Adopted: Effective: Billed After: Energy Charge Monthly Credit ... Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ...

  9. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... (cont.)  Realign tasks for information systems which focus internally on exporting data from current and ... Operator 2021-12-03 Organizational Chart Maintenance III xii FINANCIAL SECTION xiii Independent ...

  10. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

Pages